PROJECT EXPERIENCE / IRC Clinic

IRC Clinic: phased refurbishment while clinical activities continued.

We refurbished IRC Clinic in phases while clinical activities continued. The construction programme was planned around the clinic’s operating needs, coordinating work areas and the sequence in which spaces were handed back.

Capabilities demonstrated by this experience
IRC Clinic — Ulus main project image
IRC Clinic

Planning the phases as a connected programme.

Each stage of the refurbishment was considered in relation to the work before and after it. Sequencing, team coordination and preparation of spaces for use were managed through a shared programme. This approach supported controlled progress within an operating building.

Managing construction alongside use.

The relationship between active clinical areas and work zones informed the phasing decisions. Renovating sections in sequence, protecting completed spaces and preparing the next work area were managed together. Technical and architectural decisions were linked to the clinic’s operating needs.

ARKE’s contribution.

Our principal contribution was to manage refurbishment alongside the clinic’s daily operation. Planning the relationships between phases and the sequence of work allowed construction and clinical activity to progress together. The experience strengthened our approach to renovating occupied healthcare and commercial buildings.

SCOPE

Capabilities demonstrated by this experience

  • Refurbishment of an operating clinic
  • Phasing and construction planning aligned with operational needs
  • Coordination of completed areas and subsequent work zones

DELIVERY METHOD

How we work

  1. Define active areas and refurbishment phases
  2. Plan the relationships between phases and the sequence of work
  3. Renovate and protect spaces in sequence
  4. Return completed areas to use

Let’s discuss your project.

If your building needs to remain in use during refurbishment, let us review the operating conditions and phasing objectives together.