Ziraat Kule — Financial Center
We delivered interior finishing works as a subcontractor on management floors 43, 44 and 45 of Ziraat Towers. Our scope on these floors included suspended ceilings, drywall partitions, masonry walls, metal suspended ceilings, bespoke suspended ceilings, and wall/floor finishes.
- Sectors
- Corporate / commercial · High-rise buildings
- Location
- Istanbul, Türkiye
- ARKE Role
- Interior fit-out for executive floors

- Project
- Ziraat Kule — Financial Center
- Sectors
- Corporate / commercial · High-rise buildings
- Location
- Istanbul, Türkiye
- ARKE Role
- Interior fit-out for executive floors
High-specification interior finishing in high-rise buildings.
Ziraat Towers is a corporate office development within the Istanbul Financial Center. ARKE’s scope covered interior finishing works on the management floors.
On floors 43, 44 and 45, we installed suspended ceilings and partition systems alongside wall and floor finishes. Junction details and successive trades were coordinated within the same work areas.
Ceilings, partitions, wall finishes and flooring.
We considered material and installation details, site dimensions and trade sequencing together. Each completed surface was checked alongside the adjoining ceiling, wall and floor work.
- Suspended-ceiling systems
- Partition-wall works
- Wall finishes
- Floor finishes
Checking surfaces and junctions together.
Materials and installation details
We review materials, samples and installation details before work starts, then inspect the finished surfaces against the approved requirements.
Floor and work-area coordination
We plan trade sequencing by floor and area, checking readiness for the next activity before coordinating work within the same space.
Junction details
We check ceiling-to-wall and wall-to-floor junctions, finish lines and transitions between materials against site dimensions.
Outstanding work and protection
We link outstanding items to their work areas, protect completed surfaces during subsequent activities and reinspect corrections.
Completion checks by floor and work package.
We track completion by floor, work area and activity. Installation status, required corrections and reinspection are reviewed together to identify outstanding work before handover.
- Identify the floor and area
- Inspect the work
- Complete outstanding items
- Reinspect
Project views from the management floors.
Representative images have been used due to a confidentiality agreement.